Skip to content

Portfolio governance · Intertec Systems

Every mandate, traced to its measured benefit.

Strategy is a promise. Delivery is the proof. TruMandate keeps the thread between them unbroken, and its AI reads every inch of it.

A corner of the Command Centre. The demo shows it whole.

142

Projects governed

USD 60M

Portfolio budget

6

Decisions waiting on a person

24 mo

Benefits measured after closure

AI in the platform

AI proposes. A person decides. The record keeps the name.

Overnight, the model walked all 142 projects and came back with six things worth a person's morning. Each arrives carrying its evidence and its confidence. Nothing becomes the record until someone signs their name to it.

AI watch · execution0.74

Cross-department dependency at risk

Gate 3 slipped on Initiative 07. Initiative 21's start condition references it. Neither owner has escalated.

Accepted · m.alfarsi · 08:15

AI watch · strategy0.81

Two KPIs counting one benefit

Objective 2.1 and 4.3 share a source measure and an overlapping initiative set. Merge, or mark one as contributing.

Modified · h.alsuwaidi · 11:07

AI watch · benefits0.69

Benefit leakage after closure

Benefit 4.2 is 18% below forecast two quarters after closure. The KPI stopped improving when the team was released.

Open · assigned s.alnuaimi

No model output has ever entered the record unapproved.

Traceability

One identity, carried from the mandate down to the money.

One objective travels the whole way down: from the sentence a minister signed to the saving a finance office can point at.

01 · Objective

Digital government maturity

Versioned, published, weighted. A named owner.

RefObjective 1.2
Published planv3

02 · KPI

Digital service adoption

Carries Objective 1.2. No baseline, no KPI.

Baseline → target42.0 → 75.0
Live actual61.4

03 · Initiative

Unified service portal

Funded to move KPI 1.2.3, and it knows it.

FundedUSD 7.6M
Progress74%

04 · Milestone

Gate 4 · decommission

Slip is a subtraction, surfaced the day it happens.

Baseline → actual14 Aug → 26 Aug
OwnerR. Al Hashimi

05 · Benefit

Annual operating saving

Measured for 24 months after closure, against KPI 1.2.3, not a memory.

Forecast → actualUSD 14M → 11M
Measured untilMar 2028

Without the record

Strategy is written once. Then it is retyped for a year.


3 days

Planning

To answer which initiative moves which objective. Assembled by hand, in a spreadsheet, if it arrives at all.


Month-end

Execution

Before a slip reaches the office that funded the work. By then the number has been rounded by the person who will be asked about it.


Never

Benefits

Measured against the forecast after closure. The team that promised it was released before the benefit was due.

The next forty minutes

Bring one objective. We will trace it to the money.

Forty minutes, on a portfolio shaped like yours: your departments, your period, your names on the decisions. Not a demo dataset.

The essentials

Deployment

Sovereign. On-premise or in your own cloud tenancy, inside your boundary.

Language

Arabic and English, both first-class, reports included.

Operated by

Intertec Systems, Dubai.